How do I make a Booking?

Picture
What information do I need before I hire a pump?
  • Name and contact details
  •  Full site address including postcode
  • Date and time for the pump, allowing for 1hr set up
  • Size of pump required (help and guidance available)
  • Volume and type of concrete, including any additions, fibres etc
  • Brief Description of the pour, eg footings, external slab, bridge, deck etc
  • Any special requirements, additional pipeline, second man etc
What do I need to supply to ensure a safe and efficient pump pour?
  • A level area of hard standing, with no overhead obstructions, on which to set up the pump
  • Clear access to the pump for truck mixers to back onto
  • Cement to grout the line - 1 x 25kg bag per 10m of pipeline
  • Somewhere to deposit excess grout
  • A good pump mix of concrete, ensure you tell your concrete supplier that you will be using a pump
  • A competent concreting gang to lay the concrete 
  • A suitable place for the operator to wash the pump out.  
  • A good supply of water (the pump does carry its own supply)
Picture
Picture
How will the hire look on the day?
  1. The pump will arrive and liaise with the customer before set up
  2.  The customer will be asked to sign the job sheet in the "on hire" box
  3. The concrete mixer truck will arrive and back onto the pump
  4. The pump operator will grout the line and commence pumping
  5. The concrete will be placed into position using the boom where possible. 
  6. Where ground line is used the concreting gang will need to move the pipeline around as necessary
  7. Cautionary note - concrete is pumped under high pressure all personnel should be made aware of the risks and dangers associated with the end of the hose (please see risk assessment)
  8. At the end of the pour the pump operator will clean all the concrete from the pump and pipeline.  This will take approx 1hr
  9. The pump operator will then put the boom back into the travel position and load all other equipment onto pump
  10. The job sheet will be prepared for the customer to sign in the "off site" box
  11. The pump will then travel back to the depot​

Got more questions?
​Call us on 01235 851523

We operate under the Construction Plant Association (CPA) Model Terms and Conditions of Hire a copy of which can be found at the bottom of this page along with a copy of our Concrete Pumping Risk Assessment which all personnel should familiarise themselves with prior to the pour
CPA MODEL TERMS AND CONDITIONS OF HIRE 2021 - CLICK HERE
CPA SUPPLEMENTARY CONDITIONS FOR CONCRETE PUMPING
RISK ASSESSMENT - CLICK HERE
Picture
01235 851523​
​office@shaylerconcretepumping.co.uk

​2 Eastfields, Blewbury, DIDCOT, OX11 9NR
​VAT Reg:- 641 8238 39  Company Reg:- 4413357
Picture
Picture
Picture
  • HOME
  • ABOUT
  • READY MIX CONCRETE
    • TECHNICAL DATA
    • HEALTH AND SAFETY
    • TERMS AND CONDITIONS
  • PUMP HIRE
    • FAQS
    • TECHNICAL DATA
    • HEALTH AND SAFETY
    • TERMS AND CONDITIONS
  • CONTACT US